railway

Enhancing the Vision on Railway Infrastructure (2022).

Spread the love

Railway Vision 2022

Railway has taken several initiatives, strengthened railway infrastructure, and executed various measures for making the journey of its customers and passengers comfortable.

  • Infrastructure up-gradation on Neral –Matheran Light Railway
  • More FOBs, Lifts, Escalators
  • More AC local services
  • Deccan Queen express new LHB rake.
  • The Electrification of sections Jejuri – Shenoli (158 RKM), Kurduwadi – Latur (190 RKM), Mohol – Dudhani (91 RKM) & Lonand – Phaltan (26 RKM) are targeted to be completed in New Year.

Some of the highlights of Railway infrastructure during the year 2021 are:

FREIGHT PERFORMANCE :

Central Railway First time achieves 7 million tonnes loading in a month. Best ever monthly loading of 7.2 million tonnes achieved surpassing previous best of 6.96 million tonnes achieved in March 2021

So far, 770 trips of Kisan Rail ran from January to December in 2021 and a total of 900 trips of Kisan Rail have been operated since inception.

Railway Suburban Services:

  • Extension of 44 Andheri services to/from Goregaon (All Andheri services extended to and from Goregaon)
  • Increase in morning peak hour services on 4th corridor
  • Introduction of 12 AC EMU services on harbour line

Railway Non-Suburban Services

  • MEMU services on Chalisgaon – Dhule section
  • 12 rakes (6 trains) converted to LHB rake in the year 2021 and attached 166 additional coaches (AC-3 Tier, Sleeper and General Second class) to various trains for 1054 Trips.
  • Ran 1742 special trains on various occasions like summer holidays, festival holidays etc.
  • Speeding up of CSMT-Nizamuddin Rajdhani Express and provision of additional halt at Gwalior; Also made as a daily train from 19.1.2021
  • UTS Mobile App– linked with State Government portal for issuing Universal pass thereby confirming the person who has received both doses of vaccine and 14 days have lapsed since the second dose administered for issue of season tickets/journey tickets.
  • New theme-based colour schemed signages at CSMT
  • New home platform at Kopar and Ambarnath stations
  • Foot Over Bridges (FOBs) – 13 FOBs were provided during the year 2021
  • FOBs on Central Railway are 319.
  • Escalators on Central Railway are 125.
  • Escalators- 5 twin escalators in Mumbai Division
  • Lifts on Central Railway – 86.
  • Wi-Fi – Now, the Wi-Fi facility covers 379 stations on Central Railway.
  • New toilets at GTB Nagar and Lokmanya Tilak Terminus
  • Braille tactile map at Chhatrapati Shivaji Maharaj Terminus and Lokmanya Tilak Terminus
  • Vistadome coach in Mumbai-Pune Deccan Express and Pune-Mumbai Deccan Queen
  • Hadapsar Terminal at Pune started
  • Executive waiting lounge at CSMT.
  • Yatri App for general information at stations
  • Digital cloak room at CSMT
  • Restaurant of Wheels at Chhatrapati Shivaji Maharaj Terminus commissioned. The other locations identified at Lokmanya Tilak Terminus, Kalyan, Neral, Lonavala and Igatpuri on Mumbai division and Nagpur, Akurdi, Baramati, Chinchwad & Miraj stations on other divisions of Central Railway
  • So far, 4687 CCTV provided at stations including 3450 in Mumbai Division till now and CCTV cameras installed in 200 ladies’ coaches of 37 suburban rakes
  • Smart Saheli App for suburban women commuters
  • Meri Saheli App for long distance women passengers travelling alone
  • Railway Flood Relief Team with motorized inflatable boats at strategic locations
  • New Road Over Bridge constructed at Kalyan
  • Launching of girders for Hancock Road Over Bridge
  • Augmentation of waterways by micro-tunneling method at Masjid and Sandhurst Road.
  • Dudhani – Hotgi electrification (commissioned on 22.6.2021)
  • Washimbe – Bhalwani electrification (26.33 KM commissioned on 27.10.2021)
  • Dhalgaon – Kurduwadi electrification (136 TKM)
  • Shenoli – Miraj electrification (101 TKM)
  • Takari – Kirloskarwadi doubling (commissioned on 9.7.2021),
  • Ambale – Rajewadi section doubling (CRS inspection completed on 20.6.2021)
  • Jalgaon – Bhadli 11.51 km of Bhusaval-Jalgaon 3rd line
  • Four Central Railway women hockey players Ms. Vandana Kataria, Ms. Monika Malik, Ms. Sushila Chanu Pukhrambam and Ms. Rajini Etimarpu represented Indian Hockey Team in Tokyo Olympics and secured 4th place. Out of which Ms. Monica Malik and Ms. Vandana Kataria have been conferred with Arjuna Award this year.
  • Starting of Medical Oxygen plants at Solapur, Pune, Nagpur, Bhusaval and Kalyan.
  • Hospital Management Information System (HMIS) implemented at Bharat Ratna Dr. Babasaheb Ambedkar Memorial Railway Hospital, Byculla.
  • Vaccination of more than 90% staff
  • An Online International Human Resource Summit organized by Pune Division of Central Railway on 19.3.2021.

PSBs Previous post Performance and Strong position of PSBs in FY 20-21
Next post List of Top 10 Small Finance Banks in India